skip to main | skip to sidebar

LEWIS & CLARK BIBLE CHURCH BUILDING REPAIRS

Monday, August 11, 2008

There are all kinds of BRACES

Cutting the square into two triangles...

This triangle shaped block is what has been installed around the perimeter of the sanctuary where the roof meets the wall. Then metal strips are added to tie it in with the boards - when the roof is replaced, they will also nail in from above. (I'm not sure why this text is underlined - if someone has an idea about it, please let me know (Ellen).)

This brace is being installed along the bottom of the wall in the fellowship hall where our missionary bulletin boards used to be.
Posted by LEWIS & CLARK BIBLE CHURCH REPAIRS at 4:14 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (39)
    • ►  November (3)
    • ►  October (6)
    • ►  September (8)
    • ▼  August (10)
      • Roses blooming between the sawdust, lifts and siding
      • South wall siding started
      • More "remove and replace"
      • Next steps in the "ex-Fireside" room
      • Progress on the North Wall
      • There are all kinds of BRACES
      • New Braces for the Building!
      • The "ex" fireside room wall being replaced
      • Steeple removal...The bell... The bell (2)...
      • NEW BUILDING REPAIR PICS
    • ►  July (12)

About Me

LEWIS & CLARK BIBLE CHURCH REPAIRS
View my complete profile