skip to main | skip to sidebar

LEWIS & CLARK BIBLE CHURCH BUILDING REPAIRS

Monday, August 11, 2008

New Braces for the Building!




Bracing is being installed in several places - the large brace with two bolts - are now installed from the east corner of the kitchen, all along the wall to the stairs that lead up to the baptistry.
Posted by LEWIS & CLARK BIBLE CHURCH REPAIRS at 4:09 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (39)
    • ►  November (3)
    • ►  October (6)
    • ►  September (8)
    • ▼  August (10)
      • Roses blooming between the sawdust, lifts and siding
      • South wall siding started
      • More "remove and replace"
      • Next steps in the "ex-Fireside" room
      • Progress on the North Wall
      • There are all kinds of BRACES
      • New Braces for the Building!
      • The "ex" fireside room wall being replaced
      • Steeple removal...The bell... The bell (2)...
      • NEW BUILDING REPAIR PICS
    • ►  July (12)

About Me

LEWIS & CLARK BIBLE CHURCH REPAIRS
View my complete profile