Monday, August 18, 2008
Roses blooming between the sawdust, lifts and siding
I just can't resist sharing a rose picture or two with you - they have been so beautiful in the midst of all the construction -
South wall siding started
More "remove and replace"
The old cedar shakes between the first and second floor windows on the "front" of the church (classroom/playroom areas) have been replaced with the new "hardy plank" pieces to match the north wall around the stained glass window. Also, the peak of the awning over the front doors has new "hardy plank" siding.
Next steps in the "ex-Fireside" room
In addition to the replacement of the wall dividing the fireside room from the sanctuary, there will be two doorways added, so that the room can be closed (to keep the heat from going up into the balcony) and it will be more "sound - proof."
This view is looking from the room towards the stairs going up to the balcony - one of the two new doorways. The new doors will be solid, not "hollow-core."
Worker nailing in new floor - plywood sheet in our under-the-stairs closet where the Christmas decorations have been stored.
There are new floor boards and a TON of new nails in the flooring of the sanctuary and balcony.
Progress on the North Wall
Monday, August 11, 2008
There are all kinds of BRACES
Cutting the square into two triangles...
This triangle shaped block is what has been installed around the perimeter of the sanctuary where the roof meets the wall. Then metal strips are added to tie it in with the boards - when the roof is replaced, they will also nail in from above. (I'm not sure why this text is underlined - if someone has an idea about it, please let me know (Ellen).)
This brace is being installed along the bottom of the wall in the fellowship hall where our missionary bulletin boards used to be.
This triangle shaped block is what has been installed around the perimeter of the sanctuary where the roof meets the wall. Then metal strips are added to tie it in with the boards - when the roof is replaced, they will also nail in from above. (I'm not sure why this text is underlined - if someone has an idea about it, please let me know (Ellen).)
This brace is being installed along the bottom of the wall in the fellowship hall where our missionary bulletin boards used to be.
New Braces for the Building!
Friday, August 8, 2008
NEW BUILDING REPAIR PICS
Subscribe to:
Posts (Atom)